CHEMCOLOR / ALLNEX

Sign in

Costing workspace

Enter the six-digit code from your authenticator app, or an unused recovery code.

CHEMCOLOR / ALLNEX

Secure your account

Choose your own password and enable two-step verification to continue.

CHEMCOLORALLNEX COSTING

WORKSPACE

PARTNER WORKSPACE / Price list
Local preview. Its orders and ledger belong to this browser. The server package provides the shared SQL database and account permissions.

Editing technical data also requires read access to recipes, material prices and rates. Ask your administrator to review those permissions.

PRICE LIST

Allnex price list

Compare packs at a stated order quantity. View the complete calculation before placing an order.

Available packs—
Net invoiced labour · —After discount, before loss and VAT
Current marginal labour discount—Higher discount applies only above each threshold

Reference prices include labour and batch costs, with 0% annual discount. Whole packs determine the actual litres shown. The order calculates your current annual discount.

Product / sales codePackReference pieces / LLabour €/L€/piece€/L€/kgOrder pieces
EUR excluding VAT

ORDER CALCULATION

Your order

All pack sizes of the same basic product share the quantity tier and batch costs.

Review Allnex PO

Select the Chemcolor pack for every PO position. The suggested pieces round up to whole packs; you can change them. Check the proposed weight / volume and the difference from the PDF.

Using the import replaces the current unsaved order lines. Nothing is saved or submitted until you choose Save draft or Submit order.

Add packs to this order

Find a product, select its pack and add whole pieces.

This is a stored order. Use “Repeat at current prices” to build a new order from these packs.

PackPiecesL / kgLabour €/L€/pieceAmount

Production batches

PRODUCTION PLANNING

Material requirements

Planned recipe/BOM quantities for this order, including retain samples. These are not stock availability, actual consumption or an inventory issue. Financial loss and procurement markups are not physical material quantities.

Add packs to calculate planned requirements.

Annual labour discount

Only the part above each threshold receives the next discount. Thresholds use net invoiced labour.

Complete calculation

CALCULATION

Total excluding VAT€0.00

A saved order is submitted. Confirmation reserves its pricing version. Only marking it invoiced adds labour to the annual ledger.

FORECAST & PURCHASING

Supply plan

Turn a kit forecast into pack quantities, recipe requirements and supplier purchasing drafts.

Confirmed starting forecast: 1,000 kits for the next two months. The Surface Primer is PC8006 and the reducer is the SLOW version. New or unmapped packs remain provisional until an exact published SKU is selected.

1. Forecast

The starting ratio uses two PC8004 packs of approximately 3.78 L per kit. The calculation shows the actual fill of each selected published SKU.

2. Kit contents and pack mapping

Add or remove rows for future kits. An unmapped row is retained as a visible gap in the plan.

3. Planned production batches

Set batches per mapped product to plan retain samples and batch consumables. Blank uses the published recipe default; production capacity is not checked.

Calculates a draft only. No supplier order is sent and no stock is deducted.

PLANNING DRAFT

Supply plan result

WAREHOUSE & DISPATCH

Pallets & dispatch

Prepare and review pallet plans, recorded dispatch data and shipping labels.

MATERIAL PRICE LIST

Material prices

Edit material prices in the table, then review and apply your changes.

Import prices from Pantheon or Excel

Use Ident and Cena (or Code and Price). Existing rows are matched by ident; blank cells keep existing values. New materials also need Naziv and EM. XLS, XLSX and UTF-8 CSV are accepted. Stock unit costs are kept separately. Select ERP stock costs in Price list to use them.

Review price changes

IdentFieldApplied valueNew value

Applied prices update new calculations. Stored orders keep their original prices. Changes return the material price basis to PENDING approval.

Ident / materialUnitReference price EUR / unitStock cost EUR / unitPrice dateApproved supplierDetails
No unsaved changes.

MATERIAL REGISTER

Tariffs & origin

Approved suppliers, current supplier, tariff classification and supplier-specific origin evidence.

Working register. Proposed tariff codes, country hints and source statements are kept separate from confirmed data. Preferential origin depends on the reviewed evidence for the stated market, agreement, delivery lot or revision and validity period.

Project review & open points

Add suppliers only after approval for this material. Several may be approved; select exactly one current supplier, or leave it unselected.

Add approved suppliers above to enter supplier-specific tariff and origin data.

Non-preferential country of origin and preferential evidence are separate records. A country or supplier name alone does not establish preferential status.

Supplier-specific EXW value for origin review

Enter a documented value and its basis. Free-issued materials still have a value; a zero costing charge is not an EXW value.

Purchasing and stock planning

Document the supplier’s purchase packs and a dated stock snapshot. Blank means unknown; enter 0 only when no stock has been confirmed. These values do not issue or deduct stock.

Evidence by market and agreement

Record the document, validity and delivery scope exactly as reviewed. Blank or pending fields remain unconfirmed.

Material / identSuppliersCurrent supplier’s tariffCurrent supplier’s origin

OPEN-BOOK CALCULATION

Recipes & materials

Published Allnex costing data, including recipe versions and selected material prices.

PRICING

Rates & rules

Material and batch rules

Annual discounts

Net labour after discount, before loss and VAT. Submitted and confirmed orders do not count as invoiced turnover.

RECORDS

Orders & labour ledger

Stored calculations retain their recipe, prices and rules. An invoice reversal retains its audit history.

Order referenceCreatedStatusInvoiceNet labourTotalActions

Labour ledger

Mark order invoiced

The final marginal discount is calculated from the ledger at this step.

TECHNICAL DATA

Manage data

Stage changes, review the difference and publish a new version.

Staged version

Import data

Import matches identifiers and headers. A new or changed recipe remains pending. Reimporting a BOM does not overwrite negotiated material prices.

Annual labour ledger

Mode: marginal. Changes apply to future order confirmations; stored invoices retain their policy.

Calculation rules

Material price / supplier

New supplier offer

Additional cost

Labour tariffs · EUR / L

The same product and pack labels are used in Rates & rules. Columns show the volume tiers of the version being edited. Rates display two decimals; existing precision is retained until you edit a rate.

Recipe and price approval

Complete a sales pack

Workspace access

Add and manage application accounts in Users.

Advanced model data

Complete model for new tariff codes, extra-cost scope and import metadata.

Price versions

CHEMCOLOR ADMIN

Users

Manage access to the costing workspace. Removing access keeps the order history.

User permissions

Hidden removes access to the area. Read permits viewing and calculations. Edit permits saving changes where supported. Product and BOM editing uses Recipes.

Edit user

Add a user

Use at least 12 characters. The user must choose their own password and set up two-step verification at first sign-in.

Users can access only the areas granted below. Chemcolor admins have full access and can manage users.

Access permissions for the new user

ACCOUNT SECURITY

My account

Protect your access with your own password and an authenticator app.

Set up two-step verification

Use an authenticator app to generate a six-digit sign-in code. You will also receive recovery codes.

1. Add this account to your authenticator

Scan the QR code, or enter the setup key manually.

Authenticator setup QR code

2. Choose your password and confirm the code

Use at least 12 characters and a password you do not use elsewhere.

Change your password

Use at least 12 characters. Your other sessions will be signed out.

Save your recovery codes

These codes are shown once. Keep them somewhere safe, separately from your authenticator. Each code can be used once if you cannot access your app.

    Your account security is ready.

    CHEMCOLOR SEVNICA d.o.o. / ALLNEX